Overview / Agency
BART
9 recommendations from the SB 63 financial efficiency review are tracked for BART. Most recent check: November 4, 2026.
- Adopted 9
Kind of commitment: Direct action 4 Study or plan 5
Board actions
- June 11, 2026 Board item 26-249: adoption of the early action strategies identified for BART in the Phase 1 report, as listed in the Executive Decision Document. Considered at the same meeting as the FY27 budget.
Recommendations
-
Optimize the performance of the new fare gates to further reduce fare evasion, and continue the station hardening program. Adopted as: “optimize fare gate performance…”
- Status
- Adopted as of November 4, 2026
- Adopted wording
Improve fare compliance and enforcement: optimize fare gate performance to further reduce fare evasion and continue the station hardening program.
- Kind
- Direct action (from the board's adopted wording: “optimize fare gate performance”; how this is classified)
- Board action
- June 11, 2026: Board item 26-249: adoption of the early action strategies identified for BART in the Phase 1 report, as listed in the Executive Decision Document. Considered at the same meeting as the FY27 budget.
- Required by
- Each agency identifies the Phase 1 strategies it commits to and adopts them as policy or budget actions: July 1, 2026 (Gov. Code §67766(b))
- Target completion
- June 2029 (Estimated completion date in MTC Res. 4743, Attachment A.)
- Estimated savings
- Not estimated (The Phase 1 report does not estimate savings for this strategy.)
- Notes
- BART Board minutes for June 11, 2026 were not yet published in Legistar when checked. Adoption is documented by BART's June 11 news release, BART's grand jury response (p. 22: "on June 11, 2026, the BART Board approved all eight recommendations"), and MTC Res. 4743.
- Sources
- Bay Area Financial Efficiency Review, Final Report (Phase 1), posted May 27, 2026, p. 58 Review report
- BART Executive Decision Document, Adopt Senate Bill 63 Phase 1 Financial Efficiency Review Early Action Strategies (Board item 26-249, June 11, 2026), p. 2-3 Board item
- BART Board adopts FY27 budget with $18M in cuts and reductions in employee headcount (June 11, 2026) News release
- BART Board of Directors response to 2025-2026 Contra Costa County Civil Grand Jury Report No. 2608, p. 22 Agency document
- MTC Resolution No. 4743, Revised Aug. 26, 2026, Attachment A (Productivity Improvement Program), p. 8 Board item
- Entry ID
bart-p1-fare-gate-optimization· link to this entry
-
Increase parking revenue through measures such as expanded days or hours of paid parking, rate changes, more enforcement, and leasing or permitting parking at under-used facilities. Adopted as: “pursue measures such as expanded days or hours of paid parking…”
- Status
- Adopted as of November 4, 2026
- Adopted wording
Enhance parking revenue: pursue measures such as expanded days or hours of paid parking, rate adjustments, increased enforcement, and leasing or permitted parking at under-utilized facilities.
- Kind
- Direct action (from the board's adopted wording: “pursue measures such as expanded days or hours of paid parking”; how this is classified)
- Board action
- June 11, 2026: Board item 26-249: adoption of the early action strategies identified for BART in the Phase 1 report, as listed in the Executive Decision Document. Considered at the same meeting as the FY27 budget.
- Required by
- Each agency identifies the Phase 1 strategies it commits to and adopts them as policy or budget actions: July 1, 2026 (Gov. Code §67766(b))
- Target completion
- June 2029 (Estimated completion date in MTC Res. 4743, Attachment A.)
- Estimated savings
- Not estimated (The Phase 1 report does not estimate savings for this strategy.)
- Notes
- BART Board minutes for June 11, 2026 were not yet published in Legistar when checked. Adoption is documented by BART's June 11 news release, BART's grand jury response (p. 22: "on June 11, 2026, the BART Board approved all eight recommendations"), and MTC Res. 4743.
- Sources
- Bay Area Financial Efficiency Review, Final Report (Phase 1), posted May 27, 2026, p. 58 Review report
- BART Executive Decision Document, Adopt Senate Bill 63 Phase 1 Financial Efficiency Review Early Action Strategies (Board item 26-249, June 11, 2026), p. 2-3 Board item
- BART Board adopts FY27 budget with $18M in cuts and reductions in employee headcount (June 11, 2026) News release
- BART Board of Directors response to 2025-2026 Contra Costa County Civil Grand Jury Report No. 2608, p. 22 Agency document
- MTC Resolution No. 4743, Revised Aug. 26, 2026, Attachment A (Productivity Improvement Program), p. 8 Board item
- Entry ID
bart-p1-parking-revenue· link to this entry
-
Earn more revenue from fiber-optic and other communications assets, mainly through additional leasing. Adopted as: “further monetize fiber and other communications assets…”
- Status
- Adopted as of November 4, 2026
- Adopted wording
Lease fiber and communications assets: further monetize fiber and other communications assets, primarily through additional leasing opportunities.
- Kind
- Direct action (from the board's adopted wording: “further monetize fiber and other communications assets”; how this is classified)
- Board action
- June 11, 2026: Board item 26-249: adoption of the early action strategies identified for BART in the Phase 1 report, as listed in the Executive Decision Document. Considered at the same meeting as the FY27 budget.
- Required by
- Each agency identifies the Phase 1 strategies it commits to and adopts them as policy or budget actions: July 1, 2026 (Gov. Code §67766(b))
- Target completion
- June 2029 (Estimated completion date in MTC Res. 4743, Attachment A.)
- Estimated savings
- Not estimated (The Phase 1 report does not estimate savings for this strategy.)
- Notes
- BART Board minutes for June 11, 2026 were not yet published in Legistar when checked. Adoption is documented by BART's June 11 news release, BART's grand jury response (p. 22: "on June 11, 2026, the BART Board approved all eight recommendations"), and MTC Res. 4743.
- Sources
- Bay Area Financial Efficiency Review, Final Report (Phase 1), posted May 27, 2026, p. 58 Review report
- BART Executive Decision Document, Adopt Senate Bill 63 Phase 1 Financial Efficiency Review Early Action Strategies (Board item 26-249, June 11, 2026), p. 2-3 Board item
- BART Board adopts FY27 budget with $18M in cuts and reductions in employee headcount (June 11, 2026) News release
- BART Board of Directors response to 2025-2026 Contra Costa County Civil Grand Jury Report No. 2608, p. 22 Agency document
- MTC Resolution No. 4743, Revised Aug. 26, 2026, Attachment A (Productivity Improvement Program), p. 8-9 Board item
- Entry ID
bart-p1-fiber-leasing· link to this entry
-
Study the benefits, challenges, and opportunities of expanding retail and amenity partnerships at stations. Adopted as: “conduct a study to assess the benefits, challenges, and opportunities…”
- Status
- Adopted as of November 4, 2026
- Adopted wording
Expand retail and/or amenity partnerships: conduct a study to assess the benefits, challenges, and opportunities of expanding retail and/or amenity partnerships at stations.
- Kind
- Study or plan (from the board's adopted wording: “conduct a study to assess the benefits, challenges, and opportunities”; how this is classified)
- Board action
- June 11, 2026: Board item 26-249: adoption of the early action strategies identified for BART in the Phase 1 report, as listed in the Executive Decision Document. Considered at the same meeting as the FY27 budget.
- Required by
- Each agency identifies the Phase 1 strategies it commits to and adopts them as policy or budget actions: July 1, 2026 (Gov. Code §67766(b))
- Target completion
- June 2029 (Estimated completion date in MTC Res. 4743, Attachment A.)
- Estimated savings
- Not estimated (The Phase 1 report does not estimate savings for this strategy.)
- Notes
- The Oversight Committee added this strategy by motion on May 22, 2026 (report p. 58, footnote 19). BART Board minutes for June 11, 2026 were not yet published in Legistar when checked. Adoption is documented by BART's June 11 news release, BART's grand jury response (p. 22: "on June 11, 2026, the BART Board approved all eight recommendations"), and MTC Res. 4743.
- Sources
- Bay Area Financial Efficiency Review, Final Report (Phase 1), posted May 27, 2026, p. 58 Review report
- BART Executive Decision Document, Adopt Senate Bill 63 Phase 1 Financial Efficiency Review Early Action Strategies (Board item 26-249, June 11, 2026), p. 2-3 Board item
- BART Board adopts FY27 budget with $18M in cuts and reductions in employee headcount (June 11, 2026) News release
- BART Board of Directors response to 2025-2026 Contra Costa County Civil Grand Jury Report No. 2608, p. 22 Agency document
- MTC Resolution No. 4743, Revised Aug. 26, 2026, Attachment A (Productivity Improvement Program), p. 9 Board item
- Entry ID
bart-p1-retail-amenity-study· link to this entry
-
Identify more ways to improve travel time and reliability through changes to scheduling, operations, or investment in new systems or capital projects. Adopted as: “identify additional opportunities to improve transit travel time and reliability…”
- Status
- Adopted as of November 4, 2026
- Adopted wording
Improve speed and reliability of service: identify additional opportunities to improve transit travel time and reliability through changes to scheduling, operations, and/or investment in new systems or capital projects.
- Kind
- Study or plan (from the board's adopted wording: “identify additional opportunities to improve transit travel time and reliability”; how this is classified)
- Board action
- June 11, 2026: Board item 26-249: adoption of the early action strategies identified for BART in the Phase 1 report, as listed in the Executive Decision Document. Considered at the same meeting as the FY27 budget.
- Required by
- Each agency identifies the Phase 1 strategies it commits to and adopts them as policy or budget actions: July 1, 2026 (Gov. Code §67766(b))
- Target completion
- June 2029 (Estimated completion date in MTC Res. 4743, Attachment A.)
- Estimated savings
- Not estimated (The Phase 1 report does not estimate savings for this strategy.)
- Notes
- BART Board minutes for June 11, 2026 were not yet published in Legistar when checked. Adoption is documented by BART's June 11 news release, BART's grand jury response (p. 22: "on June 11, 2026, the BART Board approved all eight recommendations"), and MTC Res. 4743.
- Sources
- Bay Area Financial Efficiency Review, Final Report (Phase 1), posted May 27, 2026, p. 58 Review report
- BART Executive Decision Document, Adopt Senate Bill 63 Phase 1 Financial Efficiency Review Early Action Strategies (Board item 26-249, June 11, 2026), p. 2-3 Board item
- BART Board adopts FY27 budget with $18M in cuts and reductions in employee headcount (June 11, 2026) News release
- BART Board of Directors response to 2025-2026 Contra Costa County Civil Grand Jury Report No. 2608, p. 22 Agency document
- MTC Resolution No. 4743, Revised Aug. 26, 2026, Attachment A (Productivity Improvement Program), p. 9 Board item
- Entry ID
bart-p1-speed-reliability· link to this entry
-
Run shorter trains during lower-demand periods to better match the cost of service to the fare revenue it generates at different times and days. Adopted as: “run shorter trains during lower-demand periods…”
- Status
- Adopted as of November 4, 2026
- Adopted wording
Right-size fleet to serve demand: run shorter trains during lower-demand periods to better match the cost of delivering service to the fare revenues generated at different times of the day and days of the week.
- Kind
- Direct action (from the board's adopted wording: “run shorter trains during lower-demand periods”; how this is classified)
- Board action
- June 11, 2026: Board item 26-249: adoption of the early action strategies identified for BART in the Phase 1 report, as listed in the Executive Decision Document. Considered at the same meeting as the FY27 budget.
- Required by
- Each agency identifies the Phase 1 strategies it commits to and adopts them as policy or budget actions: July 1, 2026 (Gov. Code §67766(b))
- Target completion
- June 2029 (Estimated completion date in MTC Res. 4743, Attachment A.)
- Estimated savings
- Not estimated (The Phase 1 report does not estimate savings for this strategy.)
- Notes
- The report states BART began running shorter trains in September 2023 and realized $12 million in annual savings (p. 58); that figure describes past savings, not an estimate for this strategy. BART Board minutes for June 11, 2026 were not yet published in Legistar when checked. Adoption is documented by BART's June 11 news release, BART's grand jury response (p. 22: "on June 11, 2026, the BART Board approved all eight recommendations"), and MTC Res. 4743.
- Sources
- Bay Area Financial Efficiency Review, Final Report (Phase 1), posted May 27, 2026, p. 58-59 Review report
- BART Executive Decision Document, Adopt Senate Bill 63 Phase 1 Financial Efficiency Review Early Action Strategies (Board item 26-249, June 11, 2026), p. 2-3 Board item
- BART Board adopts FY27 budget with $18M in cuts and reductions in employee headcount (June 11, 2026) News release
- BART Board of Directors response to 2025-2026 Contra Costa County Civil Grand Jury Report No. 2608, p. 22 Agency document
- MTC Resolution No. 4743, Revised Aug. 26, 2026, Attachment A (Productivity Improvement Program), p. 10 Board item
- Entry ID
bart-p1-shorter-trains· link to this entry
-
Explore renegotiating the SFO lease payment so it better reflects the benefits, costs, incentives, and risks of BART service to the airport for both parties. Adopted as: “exploring terms of the San Francisco International Airport (SFO) Lease Agreement for possible renegotiation…”
- Status
- Adopted as of November 4, 2026
- Adopted wording
Examine contracts for opportunities to reduce costs: pursue one or all of the following: exploring terms of the San Francisco International Airport (SFO) Lease Agreement for possible renegotiation in order to more accurately reflect the benefits, costs, incentives, and risks to both parties with respect to BART service to/from the airport;
- Kind
- Study or plan (from the board's adopted wording: “exploring terms of the San Francisco International Airport (SFO) Lease Agreement for possible renegotiation”; how this is classified)
- Board action
- June 11, 2026: Board item 26-249: adoption of the early action strategies identified for BART in the Phase 1 report, as listed in the Executive Decision Document. Considered at the same meeting as the FY27 budget.
- Required by
- Each agency identifies the Phase 1 strategies it commits to and adopts them as policy or budget actions: July 1, 2026 (Gov. Code §67766(b))
- Target completion
- June 2029 (Estimated completion date in MTC Res. 4743, Attachment A.)
- Estimated savings
- Not estimated (The Phase 1 report does not estimate savings for this strategy.)
- Notes
- Table 25 of the report (p. 54) lists "Examine contracts for opportunities to reduce costs" as a Strategy for Future Consideration, while the BART section (p. 59) lists this action as an Early Action Strategy. BART Board minutes for June 11, 2026 were not yet published in Legistar when checked. Adoption is documented by BART's June 11 news release, BART's grand jury response (p. 22: "on June 11, 2026, the BART Board approved all eight recommendations"), and MTC Res. 4743.
- Sources
- Bay Area Financial Efficiency Review, Final Report (Phase 1), posted May 27, 2026, p. 59 Review report
- BART Executive Decision Document, Adopt Senate Bill 63 Phase 1 Financial Efficiency Review Early Action Strategies (Board item 26-249, June 11, 2026), p. 2-3 Board item
- BART Board adopts FY27 budget with $18M in cuts and reductions in employee headcount (June 11, 2026) News release
- BART Board of Directors response to 2025-2026 Contra Costa County Civil Grand Jury Report No. 2608, p. 22 Agency document
- MTC Resolution No. 4743, Revised Aug. 26, 2026, Attachment A (Productivity Improvement Program), p. 10 Board item
- Entry ID
bart-p1-sfo-lease-terms· link to this entry
-
Identify opportunities to renegotiate contracts, such as insurance and paratransit, to improve flexibility and achieve one-time or long-term savings. Adopted as: “identification of opportunities for renegotiation of various contracts…”
- Status
- Adopted as of November 4, 2026
- Adopted wording
Examine contracts for opportunities to reduce costs: pursue one or all of the following: [...] identification of opportunities for renegotiation of various contracts such as insurance and paratransit contracts to improve contracting flexibility and achieve one-off and/or long-term cost savings.
- Kind
- Study or plan (from the board's adopted wording: “identification of opportunities for renegotiation of various contracts”; how this is classified)
- Board action
- June 11, 2026: Board item 26-249: adoption of the early action strategies identified for BART in the Phase 1 report, as listed in the Executive Decision Document. Considered at the same meeting as the FY27 budget.
- Required by
- Each agency identifies the Phase 1 strategies it commits to and adopts them as policy or budget actions: July 1, 2026 (Gov. Code §67766(b))
- Target completion
- June 2029 (Estimated completion date in MTC Res. 4743, Attachment A.)
- Estimated savings
- Not estimated (The Phase 1 report does not estimate savings for this strategy.)
- Notes
- Table 25 of the report (p. 54) lists "Examine contracts for opportunities to reduce costs" as a Strategy for Future Consideration, while the BART section (p. 59) lists this action as an Early Action Strategy. BART Board minutes for June 11, 2026 were not yet published in Legistar when checked. Adoption is documented by BART's June 11 news release, BART's grand jury response (p. 22: "on June 11, 2026, the BART Board approved all eight recommendations"), and MTC Res. 4743.
- Sources
- Bay Area Financial Efficiency Review, Final Report (Phase 1), posted May 27, 2026, p. 59 Review report
- BART Executive Decision Document, Adopt Senate Bill 63 Phase 1 Financial Efficiency Review Early Action Strategies (Board item 26-249, June 11, 2026), p. 2-3 Board item
- BART Board adopts FY27 budget with $18M in cuts and reductions in employee headcount (June 11, 2026) News release
- BART Board of Directors response to 2025-2026 Contra Costa County Civil Grand Jury Report No. 2608, p. 22 Agency document
- MTC Resolution No. 4743, Revised Aug. 26, 2026, Attachment A (Productivity Improvement Program), p. 10 Board item
- Entry ID
bart-p1-insurance-paratransit-contracts· link to this entry
-
In consultation with MTC, identify the internal resources and supporting policies needed to expand Clipper BayPass to more institutions and employers. Adopted as: “identify internal resource requirements and supportive policies…”
- Status
- Adopted as of November 4, 2026
- Adopted wording
Expand Clipper BayPass to more institutions and employers: in consultation with MTC, identify internal resource requirements and supportive policies required or desired to expand Clipper BayPass to more institutions and employers.
- Kind
- Study or plan (from the board's adopted wording: “identify internal resource requirements and supportive policies”; how this is classified)
- Board action
- June 11, 2026: Board item 26-249: adoption of the early action strategies identified for BART in the Phase 1 report, as listed in the Executive Decision Document. Considered at the same meeting as the FY27 budget.
- Required by
- Each agency identifies the Phase 1 strategies it commits to and adopts them as policy or budget actions: July 1, 2026 (Gov. Code §67766(b))
- Target completion
- June 2029 (Estimated completion date in MTC Res. 4743, Attachment A.)
- Estimated savings
- Not estimated (The Phase 1 report does not estimate savings for this strategy.)
- Notes
- BART Board minutes for June 11, 2026 were not yet published in Legistar when checked. Adoption is documented by BART's June 11 news release, BART's grand jury response (p. 22: "on June 11, 2026, the BART Board approved all eight recommendations"), and MTC Res. 4743.
- Sources
- Bay Area Financial Efficiency Review, Final Report (Phase 1), posted May 27, 2026, p. 59 Review report
- BART Executive Decision Document, Adopt Senate Bill 63 Phase 1 Financial Efficiency Review Early Action Strategies (Board item 26-249, June 11, 2026), p. 2-3 Board item
- BART Board adopts FY27 budget with $18M in cuts and reductions in employee headcount (June 11, 2026) News release
- BART Board of Directors response to 2025-2026 Contra Costa County Civil Grand Jury Report No. 2608, p. 22 Agency document
- MTC Resolution No. 4743, Revised Aug. 26, 2026, Attachment A (Productivity Improvement Program), p. 10 Board item
- Entry ID
bart-p1-baypass-expansion· link to this entry